With the scraps from our Chinese plywood and 2x4 framing failures, we built some sawhorses sized for the trailer walls.
The original walls were built with nearly all 1x2 framing.
We wanted a bit more wood in the rot prone sill boards, so we used 1x6 with an additional 1x4 above the wheel wells.
The rebuilt curb side wall
The rebuilt street side wall
We used nearly 100 pocket hole screws to replace the rotten framing
And we even found a festive use for the remaining Chinese junk plywood
Sunday, November 15, 2015
Sunday, November 1, 2015
Uh Oh Part 4
After about 6 months in the record setting SoCal heat, our carport roof disintegrated in a late fall windstorm. We replaced it with a cheap Costco tarp that is holding up well.
Sunday, October 25, 2015
Rebuilding the floor
After many missteps, trying to replicate a thicker joist type Shasta floor, and even buying some bargain basement Chinese plywood that could literally be ripped apart with your bare hands.
A fellow trailer rebuilder from an online forum finally talked some sense into us. With his guidance, we decided to just "build it like we found it", using thicker 3/4" exterior grade plywood and 3/4" clear fir "joists" as spacers to make the floor the same thickness as before. First we laid out the joists and coated them with asphalt emulsion sealer to protect the floor from the elements.
Then we secured the plywood with 1-1/4" deck screws and countersunk carriage bolts to the metal frame. Each panel was coated with asphalt emulsion for waterproofing.
Finally, we reinstalled the wheel wells using 1/8" putty tape and hex head sheet metal screws from underneath.
Finally, after filling all the holes with wood putty, the chief helper manned the paint roller to add a protective coat of primer until we can install the final flooring material
A fellow trailer rebuilder from an online forum finally talked some sense into us. With his guidance, we decided to just "build it like we found it", using thicker 3/4" exterior grade plywood and 3/4" clear fir "joists" as spacers to make the floor the same thickness as before. First we laid out the joists and coated them with asphalt emulsion sealer to protect the floor from the elements.
Then we secured the plywood with 1-1/4" deck screws and countersunk carriage bolts to the metal frame. Each panel was coated with asphalt emulsion for waterproofing.
Finally, we reinstalled the wheel wells using 1/8" putty tape and hex head sheet metal screws from underneath.
Finally, after filling all the holes with wood putty, the chief helper manned the paint roller to add a protective coat of primer until we can install the final flooring material
Monday, October 12, 2015
Uh Oh Part 3
After our welder left, we did some inspections and found a hidden problem caused by the broken front support. Without that crossmember tying the two frame c-channels together, the channels were able to twist, allowing the trailer tongue to lift.
As we had already had the crossmember reinstalled, we didn't want to try and straighten the frame, so we had our welder back out for an hour to box the frame in, preventing further bending. We asked him to stitch weld the boxing to prevent heat stressing the metal here, as this frame is pretty weak in general.
As we had already had the crossmember reinstalled, we didn't want to try and straighten the frame, so we had our welder back out for an hour to box the frame in, preventing further bending. We asked him to stitch weld the boxing to prevent heat stressing the metal here, as this frame is pretty weak in general.
Sunday, October 4, 2015
Frame rebuild
Our wimpy broken frame was going to need some major TLC
So we came up with a plan. Replace the broken crossmember, extend the frame all the way to the rear of the trailer and add "outrigger" supports to hold up the new floor
We went through several welding quotes, all near $1000, until we found a mobile guy who works weekends for $60/hour. 4 hours later, we had our frame plan realized. Turns out the guy has a bunch of old trailers himself and was very interested in our future plans, so we'll keep him updated.
So we came up with a plan. Replace the broken crossmember, extend the frame all the way to the rear of the trailer and add "outrigger" supports to hold up the new floor
We went through several welding quotes, all near $1000, until we found a mobile guy who works weekends for $60/hour. 4 hours later, we had our frame plan realized. Turns out the guy has a bunch of old trailers himself and was very interested in our future plans, so we'll keep him updated.
Sunday, September 13, 2015
Uh Oh, Part 2
Turns out, it was probably a good thing we decided to do a "frame up" rebuild. After loosening and shifting the floor, we found that the main front crossmember was rusted through and broken loose. This thing could have been an major highway tragedy.
You can really see how the cheap floor construction coupled with the lack of metal frame and complete wall sill board rot made the rear floor area break loose.
The floor in the front didn't look so hot either
The floor in the front didn't look so hot either
Monday, September 7, 2015
"All In"
After a few weeks of stalling, we finally realized our hopes of keeping the whole camper together were just not going to happen. The sill boards were too damaged, the floor too funky and we didn't even really like the heavy grained ash paneling. Besides, due to the ash borer beetle, you really can't get ash plywood anymore, so any repairs we made would not match. We were "all in".
Bye bye curb side wall
Bye bye street side wall
Enjoy your new home for a while.
Sad little trailer floor